For the needs of Chechenenergo, Uralelectrotyazhmash shipped high-voltage equipment. A reconstruction is being carried out at the Teplichnaya substation, which feeds the Zavodskaya and Oktyabrsky districts of Grozny, within which Uralelectrotyazhmash supplied power equipment: a VEB-110 switch and three ZNG-110 transformers.